Install the battery box: 1. Select a clean, dry, shock and vibration free surface in a protected environment.
2. Position the battery box directly beneath the fire panel enclosure to which it
will be wired. (Knockouts in the battery box may be needed to line up with
the knockouts in the fire panel enclosure.)
3. Position the battery box so that it is clear of obstructions and the front door
opens freely.
4. Mark the locations of the two upper mounting bolts of the battery box
(marked A”) on the wall. (Refer to Figure 2.)
Figure 2
Mounting Holes for CAB-BATT
5. Drill the two holes located in the previous step and screw in the top bolts,
leaving a small gap between the wall and each top bolt.
6. Place the battery box over the two top bolts and allow it to slide down over the bolts.
7. Mark, drill, and install the two bottom bolts in the battery box (marked “B”).
8. Tighten all four bolts securely against the back wall of the battery box.
9. Place the batteries in the bottom of the CAB-BATT.
Seismic Applications For Seismic applications the CAB-BATT must be placed on the floor and mounted to
the wall using bolts that are
3
/8 inch in diameter.
1. Select a clean, dry, shock and vibration free surface in a protected environment.
2. Position the battery box directly beneath the fire panel enclosure to which it
will be wired. (Knockouts in the battery box may be needed to line up with
the knockouts in the fire panel enclosure.)
3. Position the battery box so that it is clear of obstructions and the front door
opens freely.
4. Mark the locations of the two upper mounting bolts of the battery box
(marked A”) on the wall. (Refer to Figure 2.)
5. Drill the two holes located in the previous step and screw in the top bolts,
leaving a small gap between the wall and each top bolt.
6. Place the battery box over the two top bolts and allow it to slide down over the
bolts.
7. Mark, drill, and install the remaining two top bolts (marked “C”).
8. For installations using 55 AH batteries, mark, drill, and install the two
bottom bolts in the battery box marked “B, as shown in Figure 2.
13.12 in
21.25 in
ø0.437 in
(3 HOLES)
9.00 in
1.06 in
26.125 in
6.63 in 8.0 in
SIEMENS INDUSTRY, INC.SIEMENS INDUSTRY, INC.
MODEL CAB-BATTMODEL CAB-BATT
INSTALLATION INSTRUCTIONSINSTALLATION INSTRUCTIONS
P/N 315-033917P/N
315-033917
FLORHAM PARK, NJ, 07932FLORHAM
PARK, NJ, 07932
“A”
“A”
“C”
“C”
“B”
“B”
“D”