User Manual

Cerberus Division
Configuration
e1754.doc
Data and design subject to change without notice. Supply subject to availability
© Copyright by Siemens Building Technologies AG Cerberus Division, CH-8708 Männedorf, Switze
r
land 1999
02.99 7
3 Configuration
To configure the lines in the GW-21, you just have to follow the steps described be-
low:
1. define the GW-21 model you are using. GW-21.04 has four lines (the default),
GW-21.06 has 6 lines. Should you be using the GW-21.04, the two rightmost con-
trols on the page are not used.
This option box lets you
select the number of lines
to be used, i.e. between
GW21-06 or GW21.04
Fig. 3-1
2. Define if the GW-21 should be supplied by a PS-21 or it is powered by some other
external source.
These mutually exclusive
option box lets you define
if the GW-21 must be
powered by a PS-21 or not
Fig. 3-2
3. Define the type of device connected to each GW-21 line.