Installation Instructions
A6V11415283_enUS_b
4
INSTALLATION
PLACE THE (4) SCREWS PROVIDED
#6-32 X 3/8 AS SHOWN
FCL2004-U1
MOUNT THE OTHER
(2) SCREWS AFTER
THE MODULE IS IN
PLACE
MSE-3L
ENCLOSURE
FHA-MIQKIT
ADAPTER
PLATE
Figure 3
Mounting the FCL2004-U1 in a MXL-IQ Enclosure
NOTE: For mounting the FCL2004-U1 module(s) in a MXL-IQ enclosure, refer to the FHA-MIQKIT-
04/FHA-MIQKIT-05 Installation Instructions, Document ID A6V11420345.
With the panel powered down completely:
1. Connect the bundled cable, P/N S54400-A66-A1, from the back of the operating unit at
connector X11 routing it per the diagram, above the top of the periboard and to the first
FCL2004-U1 at connector X600. Both connectors of the cable are keyed.
2. If installing an optional second FCL2004-U1 module, attach the ribbon cable, P/N S54400-
A66-A1, on the first FCL2004-U1 at keyed connector X601 (located next to X600) and the
other end at the second FCL2004-U1 at the keyed connector X601.
NOTE: Nothing will be connected to X600 on the second FCL2004-U1.
3. Using two conductor non-shielded (14-18) gauge wire, connect power feed from X1001 of the
AUX Power connector at the periboard and route to the X500 terminal of the first FCL2004-U1.
Terminal 1(+IN), Terminal 2(-IN), Terminal 3(+OUT), Terminal 4(-OUT). Use terminals 3 and
4(OUT) if continuing 24V Aux power to a second optional FCL2004-U1. The +3 and -4 should
be connected the second FCL2004-U1’s X500, terminals 1(+IN) and 2(-IN). Nothing is to be
connected at terminals 3 and 4 of the second FCL2004-U1’s X500 terminal.
4. For 24V CZM power(OUT), use connector X503. Use 2 conductor non-shielded (16-18) gauge
wire to terminals 1(+) and 4(-) for ALD 1; 2(+) and 3(-) for ALD 2 CZM power.