User Manual
7
Smart Infrastructure
CE2N5372en
2021-04-
06
21,0 K Temperature difference
P hot
Mounting location (Here: Heat side, can be
changed; optional)
Bd 1234 h Runtime totalizer
Fd 123 h Error time
Pd 1234 h Time with flow rate
Monthly values
LOOP 2
01.06.2011 Monthly date (due date) saving day
1234567 kWh
Monthly value (due date) energy amount
heat
1234567
cold
kWh
Monthly value (due date) energy amount
cooling (optional)
1234567 m
3
Monthly value (due date) volume on set day
Fd 123 h Missing time on set day
3,123 m
3
/h
Maximum flow rate on set day, at 2-second
intervals with date stamp
03.02.10
279,4 kW Maximum output at 2-second intervals
03.02.10
93,7 °C
Maximum output heat side at 2-second
intervals with date stamp
03.02.10
64,8 °C
Maximum output cooling side at 2-second
intervals with date stamp
03.02.10
General / Communication
LOOP 3
1234567 Device number, 7 digits
OMS RF standard (M-bus RF only)
Unbind Meter not connected (M-bus RF only)
Bind Meter connected (M-bus RF only)
MbuS Interface (only for M-bus)
127A Primary address (only for M-bus)
0000000A Secondary address (only for M-bus)
01.01 Due date (yearly set day)