Operating instructions

Commissioning
4.4 Commissioning with the BOP-2
Frequency inverters with Control Units CU230P-2 HVAC, CU230P-2 DP, CU230P-2 CAN
Operating Instructions, 01/2011, FW 4.4, A5E02430659B AD
63
4.4 Commissioning with the BOP-2
The "Basic Operator Panel-2" (BOP-2) is an
operation and display instrument of the
converter. For commissioning, it is directly
plugged onto the converter Control Unit.
Plugging on the BOP-
2
Removing the BOP-2
0RWRULVVZLWFKHGRQ
-RJLVDFWLYH
)DXOWRUDODUPLVDFWLYH
0HQXOHYHOV
6HOHFWIURPPHQX
SDUDPHWHUQXPEHUDQG
YDOXH
6HWSRLQWRUDFWXDO
YDOXHSDUDPHWHU
QXPEHURUYDOXH
2SHUDWLRQYLD%23LV
DFWLYH
6ZLWFKRQDQGVZLWFK
RIIWKHPRWRU
Figure 4-4 Operator control and display elements of the BOP-2