Operating instructions

Commissioning and Diagnostics
6.7 Commissioning and starting up the ET 200iSP
ET 200iSP
Operating Instructions, 01/2010, A5E00247483-04
149
6.7.3 Commissioning the ET 200iSP
Commissioning the ET 200iSP
Table 6- 8 Commissioning the ET 200iSP
Step Procedure See
1 Turn on the power supply for the ET 200iSP. Chapter "Wiring (Page 103)"
2 Watch the STATUS LEDs on the ET 200iSP and on
the DP master.
Chapter "Basics of
commissioning and diagnostics
(Page 133)"
Manual to the DP master
Note
The ET 200iSP supports the default startup.
The following conditions then apply:
Transferred parameters are saved and used after the switching on the supply voltage on
the Power Supply PS.
The configuration can be performed with the General Identification Format according to
the PROFIBUS standard.
See also
General Rules and Regulations for Wiring (Page 103)