Installation Instructions

NCCNT-G and NCCNT-GL Installation and Operation Manual
36
to the MMB, the node box turns to a cyan (greenish blue) color. Synchronization
has begun. The nodes will turn cyan in the order that the MMB's heartbeat is
heard by the NCC.
Once synchronization has begun, the NCC will begin to download the CSG-M of
each MXL panel. If the CSG-M has been changed since the last download, the
node box will appear in a bright green color with a percentage sign. The percent-
age sign provides benchmarks on the process of the CSG-M download. Upon
successful completion of the CSG-M download, the node box will turn back to
cyan, then to the color of the state of the MXL (for example, green for normal;
red for alarm).
NOTE The CSG-M does not contain configuration information for XLS
nodes. You must manually copy the ZEUS.xml file and import it.
Figure 34
Event Icon Descriptions
ALARM
ALARM
ACK’D
ALARM
OUT
ALARM
OUT
ACK’D
SUPERVISORY
SUPERVISORY
ACK’D
SUPERVISORY
OUT
SUPERVISORY
OUT
ACK’D
SECURITY
SECURITY
ACK’D
SECURITY
OUT
SECURITY
OUT
ACK’D
TROUBLE
TROUBLE
ACK’D
TROUBLE
OUT
TROUBLE
OUT
ACK’D
STATUS
STATUS
ACK'D
STATUS
OUT
STATUS
OUT
ACK'D