Specifications
ST900 Family General Handbook
667/HB/32900/000 Issue 11 Page 126 of 265
For example, if the entries 0 to 9 were already allocated and we needed to set-up
another phase delay which delays phase E for 4 seconds on the move from stage 2
to stage 4, we would enter:
DFZ 10=E DPG 10=4 DMF 10=2 DMT 10=4
11.6 Effect of Red Extensions and SDE/SA
During the All Red Extension period (see section 10.2) or the SDE/SA extra
clearance period (see section 9.4.2), delay timings for phases gaining ROW are
suspended and the delays will occur unchanged at the end of the extension / extra
period.
However, it is possible to configure delay times for individual gaining phases such
that they will not be suspended during an extra clearance requested by SDE/SA.