1.2 Workflow - Migration
We suggest the following workflow for migration:
1. Install InfoCenter server (basic configuration, security, network connection,
etc.).
2. Enable data acquisition through InfoCenter, either from DESIGO INSIGHT or
SICLIMAT-X.
3.
Disable data acquisition by ADP (usually after "run-in/test and/or validation time"
with InfoCenter).
4. Migrate historical ADP data (acquired before step 3) to InfoCenter (incl. ADP
archives).
5. Create and newly calculate the summary data points within InfoCenter.
6.
Regenerate the archives via InfoCenter.
7. Shut down ADP.
ADP
InfoCenter
1 3 4
5
876
Illustration. 1-1 Migration workflow – parallel steps