Installation Instructions
Installation Instructions
Document No. 570-108
February 17, 2017
BACnet Fume Hood Controller
Item No. 570-108. Rev. CA Page 1 of 6
Generic Controller I/O Layout. See Wiring Diagram for application specific details.
Control Applications
6740, 6741 and 6742
Product Description
These instructions explain how to field install or
replace the BACnet Fume Hood Controller FHC.
This BACnet Fume Hood Controls a Fast-acting
Damper or Venturi Air Valve to maintain control of a
chemical fume hood with up to 2 sashes. It uses
fast-acting electronic actuators (shipped separately)
to control the exhaust control device.
This controller is built on a BACnet Programmable
TEC (PTEC) platform that supports up to two
Offboard AVS signals. Offboard Air Module(s)
(OAM) house AVS transducers and send signals to
the AVS input(s) on the controller board. The
controller can operate stand-alone, with a field
panel, or as part of a network.
WARNING
The application cannot detect a
broken wire to the analog input for
the second sash.
An external sash aggregating
device should be used to calculate
the face area for all fume hoods
with more than one sash.
Product Numbers
BACnet Fume Hood Controller
This controller requires Offboard Air
Module(s) (ordered and shipped
separately
570-00701
Offboard Air Module – order separately
550-819B
Operator Display Panel II (ODP II)
575-820A
Power Module
AQM2200
Siemens fast-acting Lab Electronic
Actuator(s) – order and ship separately)
GNP191.1U