Commissioning Instructions
Before You Begin
Fume Hood Specific Sash Setup and Calibration
6 | 10
Siemens Industry, Inc.
A6V10801591
Restricted
07.06.2016
Example Vertical Sash Fume Hood with Fixed Area.
10.
Measure the fixed area of the fume hood in square feet (m
2
). Any fume hood
leakage must be accounted for in this measurement. Set FIXED AREA to
this value.
NOTE: The fixed area of the fume hood is an area that remains open
regardless of sash position or movement. For example, most fume hoods
have an intake gap under the lower airfoil and above the cabinet of the fume
hood (typically a 1 inch gap). Also include 1% of the maximum open face
area in this calculation for other open areas, such as the space between the
sash and the track, and leakage.
11.
If the fume hood has a fixed panel in the sash opening of Segment A, locate
the position of the panel by measuring from the bottom of the sash opening
to the bottom of the fixed panel and enter the value into FPANEL POS A.
Measure the height of the fixed panel and enter the value into FPANEL HGT
A. Repeat step 11 for Segment B.