Commissioning Instructions

Before You Begin
Fume Hood Specific Sash Setup and Calibration
7 | 10
Siemens Industry, Inc.
A6V10801591
Restricted
07.06.2016
Sash Calibration
NOTE:
The full travel of the sash must be used during calibration.
1.
Set CAL SASH NUM to 1.
2.
Verify CAL SASH LOC is set to MIN.
3.
Slide vertical sash 1 to the closed position. Measure the distance from the
bottom of vertical sash 1 to the bottom of the sash opening in inches (cm).
Set CAL SASH POS to this value. When the SOAM accepts the reading,
CAL SASH POS will revert back to
257 and CAL SASH LOC will switch to
MAX.
4.
Verify CAL SASH LOC is set to MAX.
5.
Slide vertical sash 1 to the full open position. Measure the distance from the
bottom of vertical sash 1 to the bottom of the sash opening in inches (cm).
Set CAL SASH POS to this value. When the SOAM accepts the reading, the
maximum position value will be automatically entered into POS SASH 1 and
CAL SASH POS will revert back to
257, CAL SASH LOC will switch to MIN,
and CAL SASH NUM will return to
0.
6.
Repeat Steps 2 through 5 for the remaining sash panels.
Sash Calibration Verification
1.
Close the vertical sash fully and verify that the value displayed at POS
SASH1 is at the minimum that was set during calibration. Open the sash
half way and verify that the value displayed at POS SASH 1 is equal to the
current measured value. Open the sash fully and verify that the value
displayed at POS SASH 1 is at the maximum that was set during calibration.
See Table
Sash/Point Wiring
.
2.
Repeat this verification procedure for the remaining sash panels using the
appropriate corresponding points. See Table
Sash/Point Wiring
.
Sash/Point Wiring
Sash Panel
Point
Descriptor
Vertical 1
31
POS SASH 1
Vertical 2
32
POS SASH 2
Vertical 3
33
POS SASH 3
Vertical 4
34
POS SASH 4