Commissioning Instructions

Before You Begin
Fume Hood Specific Sash Setup and Calibration
5 | 11
Siemens Industry, Inc.
A6V10801615
Restricted
07.06.2016
Sash Setup 2955
1.
Set REPORT to OVERVIEW.
Two and Four Combination Sash Configurations.
Nine Combination Sash Configuration.
NOTE: Numbers on the sashes show how the sash is wired. After the
physical sashes are calibrated, the position of the sashes will display in POS
SASH 1, POS SASH 2, and so on.
2.
Determine the number of horizontal sash panels. Set HZ PANEL CNT to this
value.
3.
Measure the width of the vertical sash in inches (cm). Set VSASH WIDTH to
this value.
4.
Measure the width of the opening in the vertical sash that contains the
horizontal panels in inches (cm). Set TRACK WIDTH to this value.
5.
Measure the height of the opening in the vertical sash that contains the
horizontal panels in inches (cm). Set PANEL HGHT to this value.
6.
Measure the width of the individual sash panels in inches (cm). Choose one
of the following:
If all the sash panels are the same width, set PANL WDTH 02 to this
value.
If all even horizontal track panels are one size and all odd horizontal
track panels are another size.
a.
Set PANL WDTH 02 to the width of the even sashes.
b.
Set PANL WDTH 03 to the width of the odd sashes.
If all panels are different sizes.
a.
Set PANL WDTH 02 to the width of sash 2.
b.
Set PANL WDTH 03 to the width of sash 3.
c.
Set PANL WDTH 04 to the width of sash 4.
d.
Repeat until all sashes are defined.