Commissioning Instructions

Before You Begin
Fume Hood Specific Sash Setup and Calibration
5 | 10
Siemens Industry, Inc.
A6V10801608
Restricted
07.06.2016
Sash Setup 2952
1.
Set REPORT to OVERVIEW.
2.
Determine the number of sash segments. Set SEG COUNT to this value.
1 to 2 will be accepted.
NOTE: A DXR Fume Hood Controller can directly handle single segment
hood configurations.
Sash Configuration.
NOTE: Numbers on the sashes show how the sash should be wired. After
the physical sashes are calibrated, the position of the sashes will display in
POS SASH 1, POS SASH 2, and so on.
3.
Measure the width of the segment containing sashes 1 and 2 in inches (cm).
Set SEG WIDTH A this value.
4.
Measure the width of the segment containing sashes 3 and 4 in inches (cm).
Set SEG WIDTH B to this value.
5.
Measure the full vertical height of the segment containing sashes 1and 2 in
inches (cm). Set TRACK HGHT A to this value.
6.
Measure the full vertical height of the segment containing sashes 3 and 4 in
inches (cm). Set TRACK HGHT B to this value.
7.
Measure the height of sash 1 in inches (cm). Set VSASH HGHT1 to this
value.
8.
Measure the height of sash 2 in inches (cm). Set VSASH HGHT2 to this
value.
9.
Measure the height of sash 3 in inches (cm). Set VSASH HGHT3 to this
value.
10.
Measure the height of sash 4 in inches (cm). Set VSASH HGHT4 to this
value.