Commissioning Instructions

Before You Begin
Verifying Power
5
Siemens Industry, Inc. 140-1318
Restricted 2015-11-04
Before You Begin
WARNING
A fume hood is a safety device.
Anyone attempting to start up a Fume Hood Controller and its related equipment
should have completed Operations Training.
Generic Controller I/O Layout. See Wiring Diagram for application specific details.
At the job site, locate the major control system and the mechanical and electrical
drawings. These components include valves, motors, and any other components
working in conjunction with the Fume Hood Controller (FHC).
Verify that the FHC input/output (I/O) points are wired per the installation instructions.
Offboard Air Module Wiring.