Installation Instructions
Installation Instructions
Document No. 565-714
October 31, 2009
Veeder-Root D
river for PXC Modular
These installation instructions cover the connection of
the Veeder-Root Driver or the Veeder-Root Enterprise
Driver to the Veeder-Root system only. For hardware
installation of the PXC Modular, see PXC Modular
Series Installation and Quick Start (553-638).
Product Description
The Veeder-Root Driver enables communication
between the APO GEE
®
Automation System and the
Veeder-Root system.
Product Numbers
PXC00-PE96.A PXC Modular RS-485 or
Ethernet ALN, 96 F LN nodes
PXC00-E9
6.A
PXC Modul
ar with BACnet/IP
ALN and BA
Cnet MS/TP ALN,
96 FLN nod
es
PXC100-PE96.A PXC Modular RS-485 or
Ethernet ALN, TX-I/O Support,
96 FLN nodes
PXC100-E96.A PXC Modular BACnet/IP ALN
and BACnet MS/TP ALN, TX-I/O
Support, 96 FLN nodes
PXX-485
.3
Expansi
on Mod ule, three
RS-485 F
LN connections
LSM-INT-VR Veeder-Root PXC Modular
Driver Lice nse
LSM-INT-VRE Veeder-Root Enterprise PX C
ModularDriverLicense
Accessories
538-670
Tr unk Interface II, 115V
538-675
Tr unk Interface II, 230V
Warning/Caution Notations
WARNING:
Personal injury/loss of life may occur if you
do not follow the procedures as specified.
CAUTION:
Equipment d
amage or loss of data may
occur if you
do not follow the procedures
as specified
.
Expected Installation Times
The expected installation time is 30 minutes.
Required Tools and Materials
• Flat-blade screwdriver (1/8-inch blade width).
• Wire strippers.
• Cabling
and connectors. See the Connecting
the Veed
er-Root Driver to the Veeder-Root
Device
s section.
CAUTION:
Always
wear an electro-static discharge
wrist s
trap and discharge accumulated
static
before touching field panel
compon
ents.
Prerequisites
• Driver hardware is installed according to its
respective installation instructions.
• FLN Termination blocks installed, if any.
Depending on the type of installation, other
prerequisites may have to be completed.
I
tem Number: 565-714, Rev. AA
P
age 1 of 4