Basic Documentation

Table Of Contents
Project Name 230900 - 6 BAS AND CONTROL FOR HVAC
Date
A. If balancing valves are installed, open them 100% and lock them in place.
B. Test the differential pressure across the valve control port to ensure the PICV is operating
within the pressure independent range.
C. Stoke the PICV valve to full open. Test the GPM across the coil. Run the system pump at the
high and lowest anticipated system pump flows. Make sure the coil GPM is attainable in all
flow conditions. If not, then increase the flow limiter on the PICV valve in steps until design
flow to the coil is reached.