10.6.10 Function check / wiring test
The current state of the step switch is displayed on the operator unit.
Main menu > Aggregates > Step switch 1…3 >
Operating line Comments
Step 1 Off, On
Step 2 Off, On
Step 3 Off, On
Step 4 Off, On
Modulating output 0...100%
During the wiring test, the step switch can be switched directly via the control
switch.
Main menu > Commissioning > Wiring test > Outputs >
Operating line Comments
Step switch 1 ---, 0...100%
Step switch 2 ---, 0...100%
Step switch 3 ---, 0...100%
During the wiring test, cascaded step switches are not considered, i.e. the wiring
test can be carried out for each step switch.
10.6.11 Priorities
The following priorities apply to the linear/binary step switch:
1. On/Off during the wiring test