Refrigeration setpoint
Heat setpoint
0%
Supply air
refr. demand
Supply air
heat demand
Supply air limit min = 15°C
Supply air limit max = 26 °C
Main menu > Commissioning > Settings > .... or
Main menu > Settings > Controller 1 > Setpoints >
Operating line Range Factory setting
Control action Slow, Medium, Fast Medium
Request evaluation Maximum, Average Maximum
Start ramp 00.00...59.55 m:s 20 min
The rate at which supply air setpoints are optimized is defined via the "Control
action" setting parameter.
In addition, you can also define how to evaluate the demand signal.
Maximum: Only the largest heat or refrigeration demand signal is considered for
shifting.
Average: All heating or refrigeration demand signals are considered as average
values for shifting.
Ramp-up serves as the transition period to collect representative demand signals
required to calculate setpoints ("Present setpoint for cooling", "Present setpoint for
heating").
The recommended values for ramp-up depend on the control response:
Control action Ramp-up
Slow 50 min
Medium 20 min
Fast 10 min
An additional universal shift is possible here. It takes priority over demand-
controlled optimization and can adjust the supply air setpoints above or below the
supply air limit value max / min.
Function diagram
Setting values
Control action
Evaluation of request
Ramp-up
Note