Siemens Universal controllers RMU710B, RMU720B, RMU730B CE1P3150en
Building Technologies Aggregates 03.10.2011
We recommend using the input of the V-belt supervision as a release for the step
switch when entering an overrun time for the step switch. This ensures that an
electric heating coil is switched on only with flow.
The external release takes priority over a signal from frost protection or from
preheating. In other words, an electric heating coil can be decoupled from the frost
function.
10.7.6 Modulating output
The output signal of the modulating output (Y) can be limited high and low.
Main menu > Commissioning > Settings > .... or
Main menu > Settings > Aggregates > Step switch > Step switch 4…5 >
Operating line Range Factory setting
Positioning signal min 0...100% 0%
Positioning signal max 0...100% 100%
Each modulating output can be inverted.
Main menu > Commissioning > Settings > .... or
Main menu > Settings > Aggregates > Step switch > Step switch 4…5 >
Operating line Range Factory setting
Inversion Yes, No
No
Meaning:
No: 0...100% Load = 0...100% output
Yes: 0...100% Load = 100...0% output
10.7.7 Assign texts
Use operation to adapt step switch texts. They are displayed at the relevant
operating line and on the menu.
Main menu > Commissioning > Settings > .... or
Main menu > Settings > Aggregates > Step switch > Step switch 4…5 >
Operating line Range Factory setting
Step switch… Max. 20 characters Step switch…
10.7.8 Function check / wiring test
The current state of the step switch is displayed on the operator unit.
Main menu > Aggregates > Step switch 4…5 >
Operating line Comments
Step 1 Off, On
Step 2 Off, On
Step 3 Off, On
Step 4 Off, On
Step 5 Off, On
Step 6 Off, On
Modulating output 0...100%
Important
Setting values
Setting values
Setting values
Display values