Technical data

Chapter 4 – Electrical Installation
Siemens Building Technologies, Inc. 15
:$51,1*
Verify that the SED2 and motor are correctly sized for the mains
voltage. Ensure that the SED2 is suited for the motor output.
Check that the mains cables are correctly sized for the anticipated use.
Confirm that appropriate circuit breakers or fuses have been installed
between the mains supply and the SED2.
Never use high-voltage insulation test equipment on any cables
connected to the SED2.
Access to Connection Terminals
To access the mains power and motor terminals, remove the operator panel, cover, and I/O module.
5192J08
1
5192J09
1
Removing Operator Panel (BOP or AOP).
5192J16
2
1
1
5192J20
2
Removing Terminal Cover. Removing I/O Module.
Figure 7. Access to Connection Terminals for SED2 Frame Size A.