Technical data
SED2 Operation & Maintenance Manual
24 Siemens Building Technologies, Inc.
Prerequisites
Prerequisites
9
Is the output of the SED2 motor rating?
Is the operating voltage range OK?
Is the rated voltage of the SED2 greater than the motor rated voltage?
Is the cross-section of the mains cable correct?
Are the cross-section and the length of the motor cables correct, and are they connected properly?
Are all control lines connected properly?
Is the motor not blocked mechanically?
Is the medium (water) available for the pump actuator (No dry run)?
Is there no pumping or blowing against still open valves or dampers?
Is the danger zone free of items or personnel?
SED2 Operator Panels
The SED2 includes the Basic Operator Panel (BOP) mounted as standard. An Advanced Operator
Panel (AOP) is available as an option.
Figure 20. Basic Operator Panel.
Figure 21. Advanced Operator Panel.
NOTE: The BOP or AOP can connect to or disconnect from the SED2 without switching off power.
Basic Operator Panel (BOP)
The Basic Operator Panel (BOP) provides access to the parameters of the SED2 and allows for
application-specific settings of the SED2.
The parameters and measured values are shown in a 5-digit LCD display. The BOP can mount directly
onto the SED2 or, alternatively, it can mount into a control cabinet door using a special installation kit
(SED2-DOOR-KIT1 or SED2-DOOR-KIT2).
You cannot store parameter data with the BOP.










