A.9.2 Rules for the Transition between Lightning Protection Zones
0 and 1
Rule for the Transition 0 <-> 1 (Lightning Protection Equipotential Bonding)
The following measures are suitable for lightning protection equipotential bonding
at the transition between lightning protection zone 0 <-> 1:
Use grounded, spiralled, current-conducting metal strips or metal braiding, for
example, NYCY or A2Y(K)Y, as a cable shield at the start and end
Lay the cables in one of the following ways:
in continuous metal pipes that are grounded at the start and end
in ducts of armored concrete with continuous armoring
on closed metal cable racks grounded at the start and end
Use fiber-optic cables instead of lightning stroke current-carrying cables.
Additional Measures
If you cannot take the measures listed above, you must install a high-voltage
protector at transition 0 <->1 with a relevant lightning conductor. Table A-3 contains
the components you can use for high-voltage protection of your plant.
Table A-3 High-Voltage Protection of Cables with the Help of Surge Protection Equipment
Ser.
No.
Cables for ... ... equip transition point 0 <> 1
with:
Order No.
1 3-phase TN-C system 1 piece
of
DEHNbloc/3 lightning con-
ductor
phase L1/L2/L3 to PEN
900 110*
5SD7 031
3-phase TN-S system 1 piece
of
DEHNbloc/3 lightning con-
ductor
phase L1/L2/L3 to PE
900 110*
5SD7 031
1 piece
of
DEHNbloc/1 lightning con-
ductor
N to PE
900 111*
5SD7 032
3-phase TT system 1 piece
of
DEHNbloc/3 lightning con-
ductor
phase L1/L2/L3 toN
900 110*
5SD7 031
1 piece
of
DEHNgap B/n N-PE light-
ning conductor
N to PE
900 130*
AC TN-S system 2 pieces
of
DEHNbloc/1 lightning con-
ductor
phase L1 + N to PE
900 111*
5SD7 032