Operating instructions

Firmware Update
Industrial Ethernet OSM/ESM
C79000-Z8976-C068-04
69
Follow the steps outlined below in Hyperterminal:
1. Set up a new connection (for example with File -> New).
2. Set the following properties for the connection as shown in the dialog below:
3. Reset the OSM/ESM. Press the Select/Set button during operation, if necessary
several times until the display LEDs indicate the port status (both display LEDs
off). Then press the Select/Set button for at least 6 seconds. The display LEDs
begin to flash after approximately 3 seconds, 2 seconds later the OSM/ESM is
reset. (All LEDs go on briefly and then off again).