Specifications

SINAMICS G150 NEMA
Type A enclosed drive
2
Siemens D11.7 (Part 1) – 2013
Description of options
2/8
Standard documentation
Customer drawings supplied with the new SINAMICS G150
NEMA are always job specific (showing the configuration
actually supplied, options not provided are not shown).
All customer documentation is provided in electronic format
on a CD, which ships inside the drive. All documents are in
pdf format (Adobe Acrobat) and are supplied in English and
a copy in Spanish. In addition, a paper copy of the Safety and
Transportation Guidelines and the Installation Check List are
included too.
D02
Customer drawings in dxf format
Schematics, outline dimension and layout drawings will be
provided in AutoCAD (dxf) on the CD (or as specified by other
option codes).
D04
Customer documentation in paper format, one set
A paper copy of customer drawings, spare parts list and test
certificate is shipped with the drive. For multiple copies, add
option code to order no. multiple times (once for each set).
D14
Advance copy of customer documentation (pdf)
To receive a copy of customer drawings earlier than with
drive shipment, i.e. after order placement (typically within
2 weeks). If option codes D02 and/or D04 are specified, the
advance copy of the drawings will be supplied in dxf format
and/or paper too.
D58
Documentation English/French
Two copies of the documentation (drawings and manuals)
will be provided on the CD (or as specified by other option
codes), one in English and the other in French.
F03, F71, F75, F77, F97
Witnessed (or observed) testing
Order Description
code
F03 Visual inspection The scope of the inspection comprises:
by customer • Checking the enclosure type
• Checking the equipment (components)
• Checking the equipment identifiers
• Checking the clearance and creepage
distances
• Checking the wires
• Checking the customer documentation
• Submitting the acceptance report
The checks are carried out with the
drive deenergized.
F71 Witnessed The scope of the witnessed test
function test of comprises:
drive without • Visual inspection as per option F03
motor • Check of power supply
• Check of protective and monitoring
devices (simulation)
• Check of fans
• Precharging test
• Functional test without connected
motor
• Submitting the acceptance report
After the visual inspection with the drive
switched off, the drive is connected to
rated voltage. No current flows at the
drive output.
F75 Witnessed function The scope of the witnessed test comprises:
test with test-bay Visual inspection as per option F03
motor, no load Check of power supply
• Check of protective and monitoring
devices (simulation)
• Check of fans
• Precharging test
• Functional test with test bay motor
(no load)
• Submitting the acceptance report
After the visual inspection with the drive
switched off, the drive is connected to
rated voltage.
A small current flows at the drive output
to power the test bay motor (no load).
F77 Witnessed test incl. The scope of the acceptance comprises:
high-voltage and High-voltage test
insulation test Measurement of insulation resistance
F97 Witnessed customer If additional witnessed testing is desired
specific drive over and above options F03 to F71,
acceptance please provide a specification/test plan
inspections/tests for the factory to submit a quotation.
(on request)