Computer Drive Installation Instructions
1 Prerequisites and Visual Inspection 03.95
1.4 Installation Checklist 840C
5. Standard installation completed and
customer specific machine data entered?
Yes No
Yes No6. PLC program entered and tested (safety functions)?
7. Position control loops of axes installed and the following checked:
Axis speeds / tachogenerator compensation / multigain / servo gain
(K
V
factor) / acceleration / exact positioning / position control loop
monitors / analog spindle speed / spindle positioning / traversing
ranges?
Yes No
Yes No
8. All conventional functions tested?
(10 mm programmed = 10 mm on machine)
9. Were backup copies made of the following data: Yes No
Yes No
•
Drive machine data (611D)
•
NC machine data Yes No
Yes No
Function test performed with test
program (by customer)?
Yes No
•
Cycle machine data
Yes No
•
Cycle setting data
Yes No
•
NC setting data
Yes No
•
R parameters
Yes No
•
Interface setting on MMC-CPU for customer devices
Yes No
•
UMS (as source floppy!)
Yes No
•
PLC user program + data blocks
Yes No
•
Were these data deposited at the machine?
Yes No
•
IKA data / ELG data
Yes No
•
QEC data
•
PLC machine data Yes No
•
WOP data Yes No
Yes No
•
Have the stickers for the installed system software been stuck
on the hardware and in the log book as specified in Section 1.3,
Standard/Export version?
Signatures
First installation Second installation
Yes No
•
Installation checklist completely filled out (including options),
inserted in the log book and deposited at the control?
Yes No
•
Were the following functions explained to the customer:
•
Drift compensation, reference point adjustment
Yes No
•
All data saved on HD of MMC-CPU and backup of HD
Yes No
•
Did the customer sign the installation report?
1–8
© Siemens AG 1992 All Rights Reserved 6FC5197- AA50
SINUMERIK 840C (IA)