Instruction manual

7ML19985CL02 SITRANS LR 300 – INSTRUCTION MANUAL Page 19
mmmmm
Installation
Dimensions: Horn
A purging system is an option available for this antenna type. This provides an inlet on
the flange where cooling air or cleaning fluid may be supplied. The air or liquid passes
through the flange and exits the inside of the horn to clean the antenna system.
Notes:
Process temperature and pressure capabilities are dependent upon information on
the process device tag. Reference drawing listed on the tag is available upon
request.
The Process Device Tag shall remain with the process pressure boundary assembly.
In the event the instrument package is replaced, the Process Device Tag shall be
transferred to the replacement unit.
WARNING: The user is responsible for the selection of bolting and
gasket materials which will fall within the limits of the flange and
its intended use and which are suitable for the service conditions.
Ø 80mm
(3")
131mm
(5.16")
225.8mm
(8.89")
100mm
(4")
150 mm
(6")
200 mm
(8")
enclosure/
electronics
process
device tag
flange
horn
325.1mm
(12.8")
Nominal
Horn
Size
Horn
O.D.
Horn
Height
Beam
Angle
100mm
(4”)
95.3mm
(3.75”)
131.0mm
(5.16”)
28
degrees
150mm
(6”)
146.0mm
(5.75”)
225.8mm
(8.89”)
20
degrees
200mm
(8”)
199.4mm
(7.85”)
325.1mm
(12.8”)
12
degrees
Notes:
Signal amplitude increases with
horn diameter, so use the largest
practical size.
Optional waveguide extensions
and/or purging system * can be
installed between the flange and
the antenna.
SITRANS LR 300.book Page 19 Monday, June 10, 2002 7:18 PM