Operating Instructions

s
en
Operating instructions
BACnet module WZU-485E-BAC
A6V12318605_----_a
2021-01-28
Original language
Comply with ESD protection measures.
Avoid short-circuits on the PCB.
When connecting, turn off the mains supply.
Route connecting cables only through the bush
sleeves of the meter.
Do not cut the bush sleeves shorter than necessary
because this may lower the degree of protection.
Note: An external power pack must power the module
(not included in the module’s scope of delivery).
Number
Description
1
Service button (under the housing cover)
2
Slot “module 1
3
Slot “module 2
4
Bushing for power cable
5
Cable grommets
Note: WZU-485E-BAC may only be combined with an
M-Bus module in slot “module 2”. Only one of them
may be operated in fast read-out mode with an up-
date interval shorter than 15 min.
Note: The module WZU-485E-BAC may only be fitted
at slot “module 1”.
Note: Open the cable sleeves in such a way that they
enclose the cable tightly.
Note: For the connection to the screw terminal, a slot
screwdriver with 2.5 mm tip is needed.
Attention: Do not connect the power supply to termi-
nals A+ and B-. This may cause permanent damage
to the module.

Summary of content (7 pages)