User Manual

CM2U8567E / 04.1999 VISONIK DCS Functions and System Messages VVS18 Siemens Building Technologies
2-334 Function TRR Landis & Staefa Division
2.32.7 LDAY, List Daily Entries
This provides a listing of Reaction entries referenced to a defined day of the week:
T8 14:43:26 Function=PNT : TRR
Operation =CH : LTAG
Operation =(CH,LI,DEL,LSTA,LOCT,LDAY): LDAY
Day(s) of Week =Mo : ?
Day(s) of Week =(&,.,*,+=,
=,Mo,Tu,We,Th,Fr,Sa,Su,Sd1,Sd2,Sd3,Sd4,Sd5
TRR 14:44:01 Start of D A T A - L I S T 12.08.1996/Mo
T8
11:00 / 1 Mo / Sd1
Reaction PACH_Change Point Parameter
Address DO $d100'041
Parameter DO___Set Digital Output: Priority=0
Value 0=Off
Reporting MSGDEV M1
15:00 / 4 * / .
Blocking Flag BL'OC'KING"01
Off
Reaction PACH_Change Point Parameter
Address DO $d100'040
Parameter DO___Set Digital Output: Priority=0
Value 1=On
Reporting MSGDEV M1
TRR 14:44:02 End of D A T A - L I S T 12.08.1996/Mo
T8
2.32.8 Special Features
If the system time is put forward (e.g. after a system HALT and advancing the time),
VISONIK updates all those Time Reactions which should have been executed during
this skipped time.
Exceptions:
On system start with BOO,Z
On generating/changing the system time/date (in Function DATE), and the user has
set "Update Date & Time Reactions =NO".
In Macro Reactions (MC) if there has been a break in system time of more than 2
hours. Only a message is given to say that VISONIK has suppressed the Macro
command.
This rapid updating of time reactions can, under certain conditions, lead to uncontrolled
switching of various plant equipment, particularly if many time reactions should be
updated.
To avoid such circumstances all command outputs (switch and position commands)
related to Time Reactions are inhibited during updating! Once updating is finished only
the resulting setpoint is output so that the peripheral plant state agrees with the actual
set state.
Update Logic