User's Manual

Automation and Drives - SCE
T I A Training Document Page 32 of 129 Module
F6
Issued: 02/2008 Operator Control with WinCC flexible 2005
Preface Installation Project Description Step7 Projekt HMI Station WinCC flexible Project Messages Recipes User Management
4.5.9 Organization Block OB1
Open OB1 by double clicking on it.
Drag FB1 from the folder “FB Blocks“ to Network 1 for the control program
Enter DB1 as instance data block.
In the message window, click on the button “Yes“.
OB1 is now complete.
Save and Close OB1.