User's Manual

Automation and Drives - SCE
T I A Training Document Page 79 of 129 Module
F6
Issued: 02/2008 Operator Control with WinCC flexible 2005
Preface Installation Project Description Step7 Project HMI Station WinCC flexible Project Messages Recipes User Management
8.1.3 Configuring a Button
To open the valves, we are configuring a button.
From the tool window under Basic Objects, drag a Button into the picture “Tank1“.
In General, place a check mark at Text EIN (open inflow valve) and enter the texts.
Caution! Don’t press the enter key after entering the text; otherwise, a new line is generated.