Operating instructions

3 Storage, transport and unpacking
WARNING!
Only return metering pumps for repair in a cleaned state and
with a flushed liquid end - refer to the section on decommis‐
sioning!
Only send metering pumps with a filled in Decontamination
Declaration form. The Decontamination Declaration consti‐
tutes an integral part of an inspection / repair order. A unit
can only be inspected or repaired when a Declaration of
Decontamination Form is submitted that has been completed
correctly and in full by an authorised and qualified person on
behalf of the pump operator.
The "Decontamination Declaration Form" can be found in the
Appendix or at
www.prominent.com
.
CAUTION!
Danger of material damage
The device can be damaged by incorrect or improper storage
or transportation!
The unit should only be stored or transported in a well
packaged state - preferably in its original packaging.
Only transport the unit when the red gear bleeding plug
is pushed in.
The packaged unit should also only be stored or trans‐
ported in accordance with the stipulated storage condi‐
tions.
The packaged unit should be protected from moisture
and the ingress of chemicals.
Compare the delivery note with the scope of supply:
n Metering pump with mains power cable
n If necessary, connector kit for hose/pipe connection
n Product-specific operating instructions with EC Declaration of Con‐
formity and supplementary information CD for ProMinent pump oper‐
ating instructions.
n As necessary, documents for options and accessories
Personnel:
n
Technical personnel
1. Place the caps on the valves.
2. Check if the red gear bleeding plug is pushed in.
3. Preferably place the pump standing vertically on a pallet and secure
against falling over.
4. Cover the pump with a tarpaulin cover - allowing rear ventilation.
Store the pump in a dry, closed shop under the following ambient condi‐
tions.
Safety information
Scope of supply
Storage
Storage, transport and unpacking
11