User's Manual

7
Figure 2 Inserting Battery Holder Into Node
Once the batteries are installed the cover door is snapped shut, and the 4” stainless steel
ground spike is installed by screwing it onto the bottom of the sensor. Hand tighten the
spike to the sensor. Do not over tighten, and do not use a wrench. Ensure the spikes are
firmly seated before placing the sensor in the ground.
The sensor is activated by pushing the ON/OFF button located in a cut-out on the bottom of
the unit as shown in Figure 3. Next to the ON/OFF button is a LED indicator light.