Installation Sheet

1Double Offset Tub Supply Installation Instructions
TOOLS AND MATERIALS:
INSTALLATION
1. Slide the bell anges (I) over the copper pipes at the nished oor.
2. Place thread sealant or plumber's tape on the copper pipes. Attach the
straight stop valves (F) with the provided compression nuts (H) and ferrules
(G).
3. Slide the remaining compression nuts (D) onto the supply tubes.
4. Place the supply tubes (C) and ferrules (E) into the straight stop valves and
tighten the compression nuts.
5. Close the straight stop valves and briey turn on the main water supply to
check for leaks. If leakage occurs, tighten the connections with an adjustable
wrench as necessary. If problems persist, contact Customer Service.
6. Install the tub faucet according to the faucet installation instructions.
DOUBLE OFFSET TUB SUPPLY
INSTALLATION INSTRUCTIONS
Before you begin, read the installation instructions below. Observe all local plumbing and building codes. For the following
installation instructions for your new tub supplies it is assumed that the water supply lines are in place and directly
accessible for installation.
Unpack and inspect for any shipping damages. If you nd any damages, do not install. Contact Customer Service at
1-866-855-2284. If you need assistance while installing your tub supplies, call our Customer Service number.
We recommend consulting a professional if you are unfamiliar with installing bathroom xtures and plumbing. Signature
Hardware accepts no liability for any damages to the oor, walls, plumbing or personal injury during installation.
PARTS LIST:
A. (2) Rubber Cone Washer
E. (2) Ferrule B. (2) Slip Nut
G. (2) Ferrule
C. (2) Supply Tube
H. (2) Compression Nut
D. (2) Compression Nut
I. (2) Bell Flange
Adjustable Wrench Plumber’s Tape
Damp Cloth Thread Sealant
A
F
E
D
C
B
H
G
I
F. (2) Straight Stop Valve

Summary of content (1 pages)