Installation Sheet

11. Attach the main water lines to the proper inlet on
the bottom of each valve stem. Use an adjustable
wrench to tighten, but be careful not to overtighten.
Apply thread sealant or plumber’s tape to each thread-
ed connection. Ensure that you are connecting the hot
and cold lines appropriately.
12. To complete the installation, install the faucet
handles using a Phillip’s screwdriver.
13. Once installation is complete, turn the main water
supply back on from below your sink. Check for any
leaks underneath.
14. Once drain installation is complete, turn the faucet
on for approximately 60 seconds to allow any dust or
loose sediment to exit the water lines. Check for any
leaks. Test both hot and cold water to ensure they are
running properly.
60 sec
SHANNON WIDESPREAD FAUCET
hot
cold
ON
4
Shannon Widespread Faucet Installation Instructions