Installation Sheet

FREESTANDING TUB FAUCET WITH SHUTOFF VALVE
INSTALLATION
1. Thread each of the bell flanges (F), one lock nut (G),
and one rubber washer (H) onto the bottom of each
lower riser pipe (E). Insert the lower riser pipes into the
prepared installation holes in the finished floor.
2. Thread one metal washers (I), and one lock nut (J)
onto each of the lower riser pipes from the under-floor
access space. Connect the lower riser pipes to the
main water supply using the rubber washers (K) and
NPT adapters (L).
3. Above the floor, apply plumber's tape or thread
sealant to the lower riser pipes’ top threads, and
connect the bottom of the straight stop valves (D).
4. Slide the slip nuts (B) onto the upper riser pipes (C)
and move them to the top.
5. Apply plumber’s tape or thread sealant to the
threads on the bottom of the upper riser pipes and
thread them into the top of the straight stop valves.
6. Insert the two remaining rubber washers (A) into the
slip nuts at the top of the upper risers.
2Freestanding Tub Faucet with Shutoff Valve Installation Instructions
FLOOR
bell flange
lock nut
rubber washer
metal washer
lock nut
rubber washer
NPT adapter
lug ells
(not included)
support mounted between floor joists
H
C
FLOOR
A B
C
D
E
F
G
H
I
J
K
L
A. Rubber Washer (2)
B. Slip Nut (2)
C. Upper Riser Pipe (2)
D. Straight Stop Valve (2)
E. Lower Riser Pipe (2)
F. Bell Flange (2)
G. Lock Nut (2)
H. Rubber Washer (2)
I. Metal Washer (2)
J. Lock Nut (2)
K. Rubber Washer (2)
L. NPT Adapter (2)