Installation Sheet

4Acrylic Clawfoot Tub Installation Instructions
ACRYLIC CLAWFOOT TUB
STEP 2: TUB INSTALLATION
1. Set the tub in the desired installation location and
mark the drain hole location on the floor.
2. Move the tub away from the installation location so
that the plumbing can be installed. The drain pipe
should extend approximately 6” above the finished
floor.
3. When the floor is finished, measure and cut the drain
pipe to the appropriate length depending on the type
of drain being used, and the distance from the floor to
the drain hole.
4. Carefully set the tub back into position and adjust
the feet adjusters as necessary. Once level, apply a
generous bead of silicone on the bottom of the feet.
This will prevent the tub from shifting after installation.
Proceed to the appropriate drain configuration to
complete rough-in and installation.
TUB AND DRAIN WITHOUT OVERFLOW
6 inches