Installation Sheet
1Marlin Outdoor Shower Installation Instructions
MARLIN OUTDOOR SHOWER
INSTALLATION INSTRUCTIONS
Before installing, read entire outdoor shower installation Instructions. Observe all local building and safety codes.
For the following installation instructions it is assumed that the water supply has been installed in the desired location
and is accessible for shower installation.
Unpack and inspect the product for any shipping damages. If you nd damages, do not install. Contact Customer
Service at 1.866.855.2284. If you need assistance or have questions while installing your shower panel, contact
Customer Service.
We recommend consulting a professional if you are unfamiliar with installing bathroom xtures. Signature Hardware
accepts no liability for any damage to the seat or wall, or for personal injury during installation.
TOOLS AND MATERIALS:
INSTALLATION
1. Assemble the shower by threading the upper and lower shower sections into the ball valve and adjusting as
necessary for proper positioning.
2. Thread the shower head onto the upper shower section. Hand tighten to secure.
Note: Apply plumber's tape to the threaded ends of the upper and lower shower sections before assembly to ensure
leak free connections.
3. If your shower features a foot wash, apply plumber's tape to the threaded ends of the foot wash arm. Thread the
shower head onto the arm and attach the arm to the shower body. Adjust as necessary. If your shower does not
feature a foot wash, move on to the next step.
4. Shift the decorative escutcheon up the shower body so that there is room for tools during installation.
5. Attach the bottom of the shower directly to the water supply. Use the included coupling and/or pipe nipple to connect
to the water supply as necessary.
6. With the mounting plate rmly in place, use a level to verify that the shower is properly aligned. If the shower is not
level place a shim underneath the mounting plate and adjust as necessary.
7. Secure the mounting plate with the appropriate anchors for the installation surface.
8. Slide the decorative escutcheon down over the mounting plate and press into place.
9. When the shower is installed turn on the water supply, check to make sure that the connections are tight (no water
should be leaking). Turn on the shower and let the water run for approximately 60 seconds.
Plumber's Tape Level Drill