Installation Sheet

6
ACRYLIC TUB WITH INTEGRAL DRAIN
INSTALLATION INSTRUCTIONS
8. Attach the flanged PVC hub adapter to the
exposed threads on the bottom of the tub. Use a
small amount of silicone on the threads to act as
sealant. Allow the silicone to dry fully.
7. Trim the 1½" PVC drain pipe extending from the
floor to the appropriate length.
9. Turn the tub to upright position. Then, apply PVC
primer and cement to the female end of hub adapter
and to male PVC pipe rough-in above floor level.
10. Center tub directly over PVC rough-in, place tub
onto PVC pipe with twisting motion to ensure proper
adhesion of PVC Cement.
Note: Unscrew the pop up mechanism and drain cover
to get a better view of the male PVC rough-in.