Installation Sheet

STAINLESS STEEL TUB INSTALLATION
6. Fill the tub with water to check for any leaks from
the connections. Verify that the drain is working
properly.
5. Apply 100% neutral cure silicone sealant to the
underside of the drain flange and thread it through
the tub and into the drain pipe. Apply thread sealant
or plumber’s tape to the threaded connection to
ensure a water-tight seal. Tighten by hand. Wipe
away any excess sealant using a damp cloth.
3Stainless Steel Tub Installation Instructions