Installation Sheet

STAINLESS STEEL TUB INSTALLATION
14. When your tub is in place and all the connections
have been made, fill the tub with water to check for
any leaks from the connections. Verfiy that the drain
and overflow is working properly.
10. Apply 100% neutral cure silicone sealant to the
underside of the drain flange and thread it through the
tub and into the drain pipe. Apply thread sealant or
plumber’s tape to the threaded connection to ensure
a water-tight seal. Tighten by hand. Wipe away any
excess sealant using a damp cloth.
11. Install the overflow assembly with the beveled
washer, overflow plate, mounting screw (provided)
and any other washers or rubber sealing gaskets
included. If your tub came with a 'Press and Seal'
overflow, the pop-up flange will be used in place of the
overflow plate and screw.
12. Attach the waste and overflow tee to the overflow
assembly and shoe assembly with sealing washers
and slip nuts. The beveled end of the sealing washer
should face the tee.
13. Attach the drain tube and flange to the waste and
overflow tee with the sealing washer and slip nut. The
beveled end of the sealing washer should face the
tee.
6Stainless Steel Tub Installation Instructions