Installation Sheet

ACRYLIC FREESTANDING TUB
3Acrylic Freestanding Tub Installation
TUB AND DRAIN WITH OVERFLOW
2. Move the tub away from the installation location so
that the plumbing can be installed. Place the drain pipe
at the appropriate height for the waste and overflow
piping. To determine this, you will need to temporarily fit
your drain pipe into the tub and measure from the floor
to the center of the drain pipe.
6. Fill the tub with water to check for any leaks from
the connections. Verify that the drain is working
properly.
7. Finish your installation by running a bead of silicone
sealant around the base of the tub where it meets the
floor. Wipe away any excess sealant with a damp cloth.
1. Set the tub in the desired installation location and
drop a plumb line from the center of the overflow hole
to the floor. This will determine your drain location. Mark
the drain hole location on the floor.