TDS

APPLICATION INSTRUCTIONS
SUBSTRATE QUALITY
Mortar and concrete must be at the required strength.
No need to be 28 days old.
Substrate strength (concrete, masonry, natural stone)
must be verified.
Pull-out tests must be carried out if the substrate
strength is unknown.
The anchor hole must always be clean, dry, free from
oil and grease etc.
Loose particles must be removed from the holes.
Threaded rods and rebars have to be cleaned thor-
oughly from any oil, grease or any other substances
and particles such as dirt etc.
MIXING
Getting the cartridge ready
1. Unscrew the cap
2. Cut the film
3. Screw on the static mix-
er
4. Place the cartridge into
the gun and start applica-
tion
When the work is interrupted the static mixer can re-
main on the cartridge after the gun pressure has been
relieved. If the resin has hardened in the nozzle when
work is resumed, a new nozzle must be attached.
Product Data Sheet
Sika® AnchorFix-1
June 2018, Version 01.02
020205010010000001
6 /
8