TDS
APPLICATION INSTRUCTIONS
SUBSTRATE QUALITY
Mortar and concrete must be at the required strength.
No need to be 28 days old.
▪
Substrate strength (concrete, masonry, natural stone)
must be verified.
▪
Pull-out tests must be carried out if the substrate
strength is unknown.
▪
The anchor hole must always be clean, dry, free from
oil and grease etc.
▪
Loose particles must be removed from the holes.▪
Threaded rods and rebars have to be cleaned thor-
oughly from any oil, grease or any other substances
and particles such as dirt etc.
▪
MIXING
Getting the cartridge ready
1. Unscrew the cap
2. Cut the film
3. Screw on the static mix-
er
4. Place the cartridge into
the gun and start applica-
tion
When the work is interrupted the static mixer can re-
main on the cartridge after the gun pressure has been
relieved. If the resin has hardened in the nozzle when
work is resumed, a new nozzle must be attached.