User's Manual
Table Of Contents
- TEAM2 SW HELP
- Introduction
- Quick Guide
- Hardware
- Hardware
- Base Station
- Charger
- Transmitters and Straps
- Bluetooth USB Adapter (USB Dongle)
- Non-secured transmitter mode
- How to...
- How to Connect Base Station to PC
- How to Insert Transmitters into Charger
- How to introduce additional base stations
- How to Introduce USB Dongle
- How to replace main base station
- How to reset base station
- How to Setup Wireless Connection
- How to synchronize transmitters with new base stations
- How to Use Transmitters
- Software
- Introduction to Software
- Main menu
- Training calendar
- Online training
- Training session log
- Training reports
- How to...
- How to...
- How to Launch Wizard
- How to Copy Values to Clipboard
- Database management
- Import data
- Online training
- Players and teams
- _
- How to Remove Players
- How to Select Team
- Seasons and training sessions
- How to Add Phases
- How to Add Season
- How to Add Training Periods
- How to Add Training Activities
- How to Add Training Session Manually
- How to Create Training Session
- How to Delete Phases
- How to Delete Season
- How to Delete Training Period
- How to Delete Training Session
- How to Modify Phases
- How to Order Training Periods
- How to Remove Training Activities
- Training session data
- How to add or modify markers afterwards
- How to correct heart rate data manually
- How to Create Training Report
- How to Create Training Session Report
- How to export training data
- How to mark training time for session
- How to Merge Training Sessions
- How to move training files
- How to Print Training Report
- How to Save Training Report
- How to Search Training Session
- How to Send Training Session Files By E-mail
- How to Share Training Session Report
- How to Transfer Data Between PC and Training Computer
- How to Transfer Data from Transmitters' Memory
- Transmitters
- Seasons and training sessions
- PDA software
- Troubleshooting
- Glossary
- Precautions
- Important Safety Information
- Regulatory Information
- Base Station
- FCC regulatory information
- FCC Radiation Exposure Statement
- Industry Canada (IC) regulatory information
- Avis de conformité à la réglementation d’Industrie Canada
- Industry Canada (IC) Radiation Exposure Statement
- Déclaration d'Industrie Canada (IC) sur l'exposition aux radiations
- Europe
- South Africa
- Singapore
- Transmitter
- Industry Canada (IC) regulatory information
- Avis de conformité à la réglementation d’Industrie Canada
- Charger
- Base Station
- Technical Specifications
- Guarantee and Disclaimer
Team2 SW Help
How to Modify Phases
1. Open the Team
2
software.
2. Select a team.
3. Select Options > Team Properties.
4. Select the Training Activities tab.
5. Select the training activity from the list on the left.
6. Select the phase from the list on the right side of the window.
7. Change the name of the phase by typing the new name into the Name input field on the
right side of the phase list.
8. Click Enter on your keyboard.
9. Click Save to save the changes. Close the window by selecting Close.
NOTE: Only the name of the phase can be changed. If you want to move the phase under
another training activity, you have to remove the old phase and create a new phase under the
new training activity.
See also How to add phases
and How to delete phases.
How to Order Training Periods
1. Open the Team
2
software and select a team.
2. Click the Training sessions button on the Training Calendar page.
3. Select a season from the upper list by clicking on it.
4. Select a training period from the lower list by clicking on it.
5. Move it up or down by clicking the
and arrow buttons.
6. Repeat steps 4 and 5 if necessary.
7. Close the window by clicking OK.
104