manual

  4. TIMING
4.1 Signal timing drawing
Figure 2. is a reference for signal timing for main power connector signals and rails.
Figure 2. PS-OK Timing Sequence
(1)T2: Rise time (0.2ms~20ms)
(2)T3: Power good signal turn on delay time (100ms~500ms)
(3)T4: Power good signal turn off delay time (1ms min)
(4)T5: Rise time (10ms max)
4.2 Hold up time
When the power loss its input power, it shall maintain 17ms in regulation limit at normal input
voltage (AC:115V/60Hz or 230V/50Hz)
  5. ENVIRONMENT
5.1 Operation
Temperature 0 to 40°C
Relative Humidity 10 to 85%, non-condensing
5.2 Shipping and Storage
Temperature -20 to 60°C
Relative Humidity 5 to 95%, non-condensing
5.3 Altitude
Operating 10,000FT max.
Storage 50,000FT max.