User Manual

SGD-SB2025NT-TUM, Part 2
Jan 12 Page 39
SOLAR CONFIGURATION
Figure 28. Central #1 allocated and operating.
4.4.5 Channel Designation (Multi-channel TM Option)
At this stage, every Station NI will be assigned to operate on Channel 1 – this is the default setting.
This does not affect the commissioning process, although it is likely that the task will be conducted
on a channel by channel basis.
Therefore, the user may prefer to go directly to
Section 6 Solar Channels (Relations)
, which
details the procedures for assigning Station and Central NIs to channels, before proceeding to
Section 5 – Solar Commissioning
.