User Manual

SGD-SB2025NT-TUM, Part 2
Jan 12 Page 59
SOLAR COMMISSIONING
5.3.2.1 Name
To enter or change the ‘Name’ text, select the ‘Eng’ button, click in the ‘Name’ text box and enter
or amend the text as required (the limit is 20 characters). As for all settings, a change must be
completed by using ‘Apply’, which will take immediate effect as the information remains with the
TM; i.e. it is not transmitted through the Solar supervisory system.
5.3.2.2 GPS Module
The GPS/timing interface is an independent sub-module within the Solar 2 unit. It is accessible
from and available to any of the main modules that are fitted to the unit. Consequently, any action
or setting applied through one module is visible to and open to change through another module.
Therefore, refer to
Section 5.2.3.2
on the NI for all the necessary information on the GPS module
options and settings.
5.3.2.3 Misc Alarms
The indicators shown on the ‘Status’ page are a repeat of those presented on the TM Status panel.
The “Alarm’ page is covered under
Section 12 – Alarms
.
5.3.2.4 SNMP
This feature is an option that is controlled by the ‘Facility Key’ and may not be present on all
versions of the TM. The feature is covered under
Section 14 – SNMP
.
5.3.3 Environment
The ‘Environment I/O’ interface is an independent sub-module within the Solar 2 unit. It is
accessible from and available to any of the main modules that are fitted to the unit. Consequently,
any action or setting applied through one module is visible to and open to change through another
module.
Apart from the additional pages for ‘Alarms’ (see
Figure 53
below), the options and settings are
identical to those available to an NI. Therefore, refer to
Section 5.2.3
for all the necessary
information. For full details on the ‘Alarms’ pages see
Section 12 – Alarms
.
Figure 53. TM Engineering – Environment page.