Unit installation
VdS Shunt lock function 3066 
Page 14 
 +
 8
..16 V
 Masse
 +LED
 - LED
  C
  NC
  N0
 SAB0
 SAB0
 SAB0
 SAB0
2.4 Installing the Slave Activation Unit (SA) 
Soldering terminal assignments:   
  1  Supply voltage positive pole 
  2  Supply voltage negative pole (ground) 
  3 + 4  Connection for LED (5 volts) in outside area 
  5 - 7  Not used 
  8 - 11  Sabotage contacts 
  12  Optional activation suppression when ground is applied 
(for example, lock contact evaluation) 
  13  Deactivation acknowledgement (input) 
  14  Activation request to the master activation unit MA (output) 
  15  Ground (identical to soldering terminal 2) 
  29  Acoustic activation acknowledgement by BAC (not for DA) 
  30  Solder terminal for cable screen 
Jumper settings: 
Jumper connects right and middle contacts of B1: 
⇒ Acoustic acknowledgement after activation release by activation unit 
Jumper connects left and middle contacts of B1: 
⇒ Acoustic acknowledgement after final activation is done by the BAC. The BAC 
must draw pin 29 to ground (VdS-compliant configuration).   










