Operator`s manual
12-3
Additional Tests to be Done Annually.
AS 1851
Item No.
Description
Action Required and Pass/Fail Criteria
Test Facility,
Procedure, Notes
2.13
Visual
Indicators
Test the operation of CIE LED and alphanumeric
indicators.
Refer Chapter 9
Lamp Test
2.14
Warning
System
Test the operation of the warning system.
Alarm Test as per
Item 2.1 above.
2.15
Battery
Where the battery has not been replaced within the
previous two years, test the battery capacity by load
discharge testing to confirm that the battery satisfies
the system alarm current for at least 30 min with a final
voltage of not less than 90% of nominal battery
voltage.
The 4100ES-S1
battery test functions
do not meet the
requirements of this
test. A separate test
method must be
used. Refer to
Battery Load
Discharge Testing
(AS 1851 Item
2.15) below.
2.16
Ancillary
Controls
In-situ test the operation of ancillary control functions
and ensure that each controlled device can be correctly
initiated.
Operate-test the
outputs – refer to
Chapter 4 Turning a
Point ON or OFF
2.20-2.27
Detector Test
Test the detectors as per relevant test item in Table
6.4.2.
Walk-Test mode
may be used to speed
up testing of devices
in a zone.
Refer Chapter 10.
2.28
Functional
Test
Test that the warning system tones are audible in all
areas of the building.
Use a Zone Alarm
Test to activate the
Warning System as
per Items 2.1 above.
2.29
Interface &
Control Test
Conduct a functional system test with other interfaced
fire systems, (e.g., sprinkler, sound system, HVAC) as
set out in relevant sections of [the] Standard.
Verify that the interface functions in accordance with
the system interface schematic for the building.
Use Zone Alarm
Test or (Output)
Point Operate Test.
Refer to items 2.1
and 2.16 above.
Additional Tess to be Done Five-Yearly
AS 1851
Item No.
Description
Action Required and Pass/Fail Criteria
Test Facility,
Procedure, Notes
2.3
Power Supply
Supervision
Where the CIE is monitored, reduce the CIE operating
voltage to trigger a power supply supervision fault and
confirm that it is processed by the monitoring service
provider. Where the CIE is a sub-CIE confirm that the
power supply supervision fault condition is indicated
at the fire CIE.
This test requires
equipment external
to the 4100ES-S1.
2.31
Smoke,
Flame and
CO Detectors
Check the sensitivity of all detectors to ensure each is
within the required sensitivity range.
Check contamination levels. Record snippet of
sensitivity report.
Check contamination levels. Record snippet of
sensitivity report.
Refer Chapter 9
Displaying IDNet
& Mapnet Device
Status
Annual Tests
Five Yearly
Tests