Operator`s manual
12-4
The 4100ES-S1 Fire Alarm Panel has no provision for load discharge testing of the battery at the
levels required for yearly testing to AS 1851-2005.
A load discharge method separate from the panel must be arranged in order to meet this
requirement. For example, apply an external test load to the battery and operate the 4100ES-S1
with mains power off for 30 minutes. Check the battery voltage at the end of the test.
4100ES-S1 does not include built-in facilities to carry out this test. A suitably rated bench power
supply connected to the battery terminals with main power turned off may be used instead.
Ensure the panel is normal – i.e., no faults and no system conditions that cause the Fault relay to
be re-designed are present.
Reduce the bench power supply output voltage to below the minimum operating voltage and
check the Fault relay de-energises.
If the PSU supervision signal is monitored, confirm that it is received at the monitoring service
or at the main CIE. The status of the PSU/Batt can be observed in the Card Status recalls (refer
Section 9.3). This will indicate Fault condition when the system voltage is below the minimum
operating voltage.
Battery Load
Discharge
Testing (AS
1851 Item 2.15)
PSU
Supervision
(AS 1851 Item
2.3)